Units, offices, schools, shopfronts and blocks, programmed around the trades that have to follow us on. Commercial access is as much about sequencing and paperwork as it is about tube and fitting: handover certificates, weekly inspections while it stands, loading bays where materials have to land, and pedestrian protection where the public walk past. We work to your programme and give you a date we will hold.

Erect, alteration and strike dates agreed against the build programme so we are not the trade holding everyone up.
Loading towers and bays designed in where materials have to get up, rather than bolted on later.
Fans, netting, debris protection and covered walkways where the scaffold sits over a footpath or a shop entrance.
Handover certificate on completion and inspections at the required intervals while the scaffold is standing.
Both. A lot of what we do is direct for main contractors on commercial refurbishments and new build, and we also work for roofing, cladding, render and solar contractors who need access as part of their own package. Either way you get one point of contact for the erect, any alterations and the strike, rather than being passed around.
Yes, and on retail and hospitality units it is often the only sensible way to do it. Erecting a shopfront scaffold before opening or after close means the unit trades normally through the job. It needs planning a week or two out so we have the team and any licences lined up, so tell us early if that is what the site needs.
Yes. Risk assessments and method statements are issued for the job before we come to site, along with insurance details and the design information for anything that is not a standard TG20 configuration. If your principal contractor has a particular format or a portal they want it uploaded to, tell us and we will work to it.
Scaffolding in use has to be inspected before first use and at intervals not exceeding seven days, and after anything that could affect its stability such as a storm. We carry those inspections out and record them, and the record stays with the scaffold. If your site prefers to inspect it themselves, that is fine, but the handover certificate still comes from us.
Yes, and most of our commercial work is on premises that carry on trading or teaching while we are there. That means covered walkways and fans over entrances, netting or sheeting where debris is a risk, clear signage, and access that keeps the public and the site separate. It is planned into the design rather than improvised on the day.
You will get a response and a date within 7 days of enquiring, usually sooner. Send drawings, elevations or a site plan and we can price most commercial jobs from them, then come out to confirm the ground conditions and the tie positions before anything is committed.

Call, WhatsApp or send the form and we will come back to you with a straight answer.
Send photos of the property and we can price most jobs from them.
Every enquiry gets an answer and a date in the diary within 7 days.
Southampton and surrounding areas, domestic and commercial.